5 buildings · Hong Kong portfolio
Last sync · 14 min ago
Reporting period: Jan–Apr 2026
CarboniQ / Data Hub
Data Hub
Every carbon-relevant data source for the portfolio — BIM geometry, BMS feeds and EPDs — in one place, with data quality tracked as a single readiness score.
Portfolio readiness
78%
BMS feeds live
4 of 5
EPD coverage
62% verified
Buildings needing action
2 of 5
Needs attention now
Ranked by effect on carbon calculation and reporting.
Central Tower A — BMS feed offline 47h
Harbour Place B — 3 EPDs missing (fit-out)
Wan Chai Hub D — BMS schema mismatch, usage anomaly +34%
3 new HKGBC EPDs match your materials list
Data sources
Preset BIM is active — replace it here only if you want to use a different model.
Drop a file to replace the preset model, or click to browse
Current: CentralTowerA_preset.ifc · 1,842 elements · 24/26 evidence sources ready
Files
| File | Type | Size | Mapped | Status |
|---|---|---|---|---|
XML CentralTowerA_preset.ifc |
BIM geometry | 18.6 MB | 1,842 / 1,842 elements · 64 zones | Parsed |
XLS HKE_consumption_2025Q4.xlsx |
Energy data | 1.2 MB | 11,520 / 11,520 rows | Parsed |
PDF EPD_concreteC60_NipponSteel.pdf |
EPD | 340 KB | 6 / 6 attributes | Linked |
IFC HarbourPlaceB_renovation.ifc |
BIM geometry | 14.8 MB | 284 / 412 elements | EPD gaps |
CSV WanChaiD_BMS_Apr22.csv |
BMS feed | 820 KB | — | Schema mismatch |
BMS & meter connections · last 30 days
| Building | Provider | Last sync | Streams | Health |
|---|---|---|---|---|
| Central Tower A | CLP SmartPower | 47h ago | HVAC · Lighting · Lifts | Offline |
| Harbour Place B | HK Electric SmartPacific | 14 min ago | HVAC · Lighting · Water | Healthy |
| Kowloon Comm. C | Siemens Desigo | 9 min ago | HVAC · Lighting · Lifts · Water | Healthy |
| Wan Chai Hub D | CLP SmartPower | 22 min ago | HVAC · Lighting | Anomaly +34% |
| Discovery Park E | HK Electric SmartPacific | 8 min ago | HVAC · Lighting · Lifts · Water | Healthy |
Data quality checklist
Building geometry imported
5 of 5 buildings · BIM or gbXML
BMS feeds connected
4 of 5 buildings · 1 reconnect needed
EPD coverage
62% verified · 24% industry avg · 14% missing
Grid emission factors set
HK 0.7 kgCO₂/kWh · CLP & HKE
Landscape inventory
Optional · skip if not pursuing SI credit
Refrigerant inventory
For Scope 1 fugitive emissions
EPD library search
HKGBC · LETI · Athena
Concrete C60 · Nippon Steel
285 kgCO₂e/m³ · A1–A3 verified · HKGBC
Concrete C60 · Hanson HK
312 kgCO₂e/m³ · A1–A3 verified · HKGBC
Concrete C60 · GGBS 30%
228 kgCO₂e/m³ · A1–A3 verified · LETI
+ Suggest a missing EPD
Request HKGBC verification on your behalf